Work to adapt metro line 11 is continuing. This will require recurring closures in 2023. The line will be closed in the evenings as from 10:00 p.m., from Tuesday to Thursday, untill 28 September 2023.
The closures will allow the new MP14 trains to be tested on the existing line in preparation for the extension. Please use connecting metro, bus, RER and tram lines. Our station staff are available to inform you of the times of the last train from each station and to provide more specific information.
Closures between Belleville and Mairie des Lilas stations from 24 March to 2 April 2023
To prepare for the delivery of new MP14 rolling stock, works will be conducted on signalling systems and security equipment. Traffic will be suspended as such from 24 March to 2 April 2023 between Belleville and Mairie des Lilas stations. Belleville station will be the line’s temporary terminus.
A replacement bus service will run between Belleville and Porte des Lilas stations for the entire duration of the closure.
To best adapt your journey:
- To plan your travel in advance and find out your journey time, please consult the itinerary planner
- Twitter account @Ligne11_RATP
- Consult the metro line 11 map