M10 extension to Ivry Gambetta
Numerous urban development projects are currently in the study phase between the Seine and the RER C and D railway sidings, notably the Paris Rive Gauche and Ivry Confluences joint development zones (ZAC). The southern extension of the M10 from Gare d’Austerlitz provides a structural response to the transport needs identified in this fast-changing area.

The Île-de-France Regional Council’s masterplan (SDRIF), approved in 2013, calls for the M10 to be extended eastwards in two phases: to Ivry-Gambetta by 2030 and to Les Ardoines (Vitry-sur-Seine) after 2030.

Useful informations :

  1. Départements 75 and 94

  2. Connections with the RER C, M6, M14 and T3a

  3. Future connections with M15 and T ZEN 3

Advantages

  • The first phase of the extension, between Paris-Gare d’Austerlitz and Ivry-sur-Seine (Place Gambetta), will cover about 4 km and provide connections with the M6 and M14, RER C and tramway T3a, in addition to the future T Zen 5 dedicated bus lane and numerous other bus lines.
  • The 2nd phase of the extension will cover a similar distance between the Ivry-Place Gambetta station and the Ardoines station (Vitry). It will serve the Ardoines urban development zone currently under construction and will connect with the future M15, T Zen 5 dedicated bus lane and RER C.

Urban integration

Four intermediary stations were proposed by the Grande 10, an association comprised of the Ivry-sur-Seine and Paris municipalities, the EPT12 (Grand-Orly Seine Bièvre) and the Val-de-Marne General Council. The four stations will be located between Gare d’Austerlitz and the terminus of the first extension at Ivry-Gambetta: Chevaleret, Bibliothèque François- Mitterrand and Masséna Bruneseau in Paris (13th arrondissement) and Ivry-Nelson-Mandela in Ivry-sur-Seine.

Key figures

+5 to 6.5
km
extension to Ivry-Gambetta, followed by an additional 4 km to the Ardoines station. 5 new stations will be created to serve an estimated 55,000 to 75,000 passengers each day.

Calendar

  • 2008-2011: project studies
  • 2013: project incorporated in the Île-de-France Regional Council Masterplan (SDRIF); RATP is contracted to conduct emergence study
  • Towards 2030: start-up of service on the first part of the M10 extension to Ivry-Gambetta
  • After 2030: start-up of service on the second part of the M10 extension to the Ardoines station (Vitry)
Extension M10 - Platform - RATP
Extension M10 - Platform - RATP
Extension M10 - Platform - RATP

Project players

The Île-de-France Regional Council

The Île-de-France Regional Council devotes a major share of its budget to transport improvements and developments. The M10 extension is part of the 2015-2020 State-Region projects agreement (CPER) and was named one of the priorities for the Île-de-France region for the 2030s.

Paris Municipal Council

The Val-de-Marne General Council

Île-de-France Mobilités

RATP

Project costs and financing

On 11 December 2013, the Île-de-France Mobilités board of directors approved the “study financing agreement for an emergence study” on the “M10 extension from Gare d’Austerlitz to Ivry-sur-Seine”, for a total of 300,000 € (French State: 30%, Île-de-France Regional Council: 70%).

• Download the leaflet on the project [This content is not available in English]